Case Excavator Track Roller
Case Excavator Track Roller

Case Excavator Track Roller

This item is a CASE excavator track roller. It is designed in forged alloy steel, and the rollers use highly polished shafts and bronze bushings. Effectively increase its service life.

As a track roller manufacturer, We also have many different makes and models of tracked construction equipment parts. If you need it, you can contact us at any time.

Our Business Scope

  • Excavator/bulldozer parts. include Carrier roller、 Front idler、Sprocket、Track roller.
  • Excavator bucket tooth.
  • Customized excavator/bulldozer undercarriage parts.

Product Name: Case Excavator Track Roller/Lower Roller

Product Information: Excavator and dozer track roller from china

Material: 50Mn,40Mn,40MnB.

Finish: Smooth

Technique: Forging, Casting.Heat treatment

Surface Hardness: HRC46-58,depth:6mm-10mm

Colors: Black, yellow, and gold, as your requirement

MOQ: 2 piece

Warranty time: 2000 hours (1 year)

Payment Term: TT, L/C, Western Union, other payment terms.

Applicable: Crawler Excavator or bulldozer

Case Modle

CX130DCX160DCX250DCX300D
CX145D SRCX210DCX350DCX500D ME
CX245D SRCX290DCX490DCX750D
CX17CCX37CCX30CCX60C
CX26CCX57C
Case Excavator Track Roller

All the above Case models are for reference only. If you don’t have the model you need, you can contact us.

If you need a special size track roller, please contact us, we can customize the accessories according to your drawings. We can also customize according to the material, color, etc. customers need.

  • We are the manufacturer with rich experience and guaranteed product quality
  • Master the key links of production, casting, forging, machining, heat treatment, and assembly.
  • Manufactured according to customer specifications
  • The sales team is experienced and trained to understand your equipment and help you find the best solution for your needs.
  • Delivery Time: Within 30 days after contracted (Stock products for 7 days)
  • Port: Qingdao, Shanghai, other port in china
  • Package: According to customer requirements
  • Transportation time: For express/ air, it takes about 5 days. For land/ sea, it takes about one month. It depends on your address.
  • Has a perfect quality control system to produce perfect products.
  • A team will carefully inspect product quality and specifications, monitoring each production process until packaging is complete.

Related Products

Case Excavator Track Roller CK36

Case Excavator Track Roller CX55

Case Excavator Track Roller CX210B

Case Excavator Track Roller CX310

Case Excavator Carrier Roller

Case Excavator Sprocket

Case Excavator Front Idler

Case Excavator Bucket Tooth