Sany Excavator Track Roller
Sany Excavator Track Roller

Sany Excavator Track Roller

This item is a Sany excavator track roller/bottom roller. It is used for the Sany excavator/bulldozer.

We are a manufacturer specializing in the production of spare parts for small excavators, heavy excavators, and bulldozer chassis. At the same time, we also produce parts for other brands. If necessary, you can consult us at any time.

Our Business Scope

  • Excavator/Bulldozer parts. include Front idler、Sprocket、Carrier roller、Track roller、 Bucket tooth.
  • Customized excavator undercarriage parts.
Product NameSany Excavator Track Roller
Product Information Excavator and dozer track roller/bottom roller from china
Other Name Bottom roller
Material 50Mn, customized
FinishSmooth
ColorsBlack, yellow,as your requirement
TechniqueForging and Casting
Surface HardnessHRC 46-52
Surface Hardness Depth 4mm-8mm
MOQ1 piece
Warranty time2000 hour
Payment TermTT, L/C, Western Union
Sany Excavator Track Roller

Sany Excavator Model

SY210CSY155SY335CSY2600E
SY220CSY365CSY215CSY980H
SY135SY870HSY205SY1250H
SY225SY550HDSY500HSY415H
SY750SY395HSY375HSY140C
SY245SY485HSY265C
Sany Excavator Track Roller

All the above Sany models are for reference only. If you don’t have the model you need, you can contact us.

If you need a special size track roller, please contact us, we can customize the accessories according to your drawings. We can also customize according to the material, color, etc. customers need.

  • We are the manufacturer with rich experience and guaranteed product quality
  • Master the key links of production, casting, forging, machining, heat treatment, and assembly.
  • Manufactured according to customer specifications
  • The sales team is experienced and trained to understand your equipment and help you find the best solution for your needs.
  • Delivery Time:  Within 30 days after contract. (Stock products for 7 days).
  • Package: strong wooden pallet for export, According to customer requirements.
  • Port: Qingdao, Ningbo, Shanghai, and other ports in china.
  • For express/ air, it takes about 5 days.
  • For land/ sea, it takes about one month.
  • Depends on your address.

Related Products

Sany Excavator Track Roller SCC500

Sany Excavator Track Roller SCC1000

Sany Excavator Track Roller SY35

Sany Excavator Track Roller SY195

Sany Excavator Carrier Roller

Sany Excavator Sprocket

Sany Excavator Front Idler

Sany Excavator Bucket Tooth