Bofors Excavator Carrier Roller
Bofors Excavator Carrier Roller

Bofors Excavator Carrier Roller

The excavator carrier roller consists of a roller body, shaft, journal, bimetal bearing, and seal. Our carrier roller is suitable for Komatsu, Hitachi, Kobelco, Daewoo, Hyundai, Volvo, JCB, etc. This product is a Bofors excavator carrier roller.

We can also provide customized services according to your requirements. If you have any needs, welcome to consult.

Our Business Scope

  • Excavator/Bulldozer undercarriage parts: Bucket tooth、Front idler、Sprocket、Carrier roller、Track roller.
  • We also customize the excavator/bulldozer part.
  • Affordable Price 
  • Fitment Guarantee 
  • Bulk discounts for large order
  1. Product Name: Bofors Excavator Carrier Roller
  2. Product Information: Excavator parts carrier roller/top roller manufacturer in china
  3. Colors: Yellow,black,gold,blue,green,other colors
  4. Material: 50Mn,40MnB, other alloy steel
  5. Finish: Smooth
  6. Technique: Machining, Forging, Casting.Machining
  7. Surface Hardness: depth 6-12mm, HRC46-54,
  8. MOQ: 2 piece
  9. Warranty time: 12 months
  10. Applicable Industries: Construction works
  11. Supply Ability: 300 Piece/Pieces per day
  • First-rate material
  • Wear resistance. corrosion resistance. high strength
  • The forged alloy steel design can effectively increase its service life.
  1. We are the manufacturer with rich experience and guaranteed product quality
  2. Master the key links of production, casting, forging, machining, heat treatment, and assembly.
  3. Manufactured according to customer specifications
  4. The sales team is experienced and trained to understand your equipment and help you find the best solution for your needs.
  • Delivery Time:  Roughly 4 weeks after receiving deposit. (products in stock within 5 days.)
  • Package: Pallet/wooden case or customized
  • Shipping ways: By Air, Sea, and Express
  • Port:  Any port in china.
  • Transportation time (depends on your address.): For express/ air, it takes about 5 days. For land/ sea, it takes about one month.

Related Products

bofors excavator bucket tooth

Bofors Excavator Bucket Tooth

Bofors Excavator Track Roller

Bofors Excavator Sprocket

Bofors Excavator Front Idler