
Kubota Carrier Roller
This item is a brand new crawler carrier roller suitable for Kubota excavators/undercarriage.
Our Business Scope
Customized excavator undercarriage parts. include Front idler、Sprocket、Carrier roller、Track roller.
| Product Name | Kubota Excavator |
| Product Information | Kubota excavator carrier roller from china |
| Other Name | Top roller, upper roller |
| Place of Origin | Shandong China |
| Material | 50Mn,40M,40SiMnTi |
| Colors | Black, yellow, other |
| Finish | Smooth |
| Surface Hardness | depth:6mm-10mm, HRC48-56. |
| Technique | Forging, Casting, Machining, Heat treatment |
| Warranty time | 365 days |
| MOQ | 2 piece |
| Payment Term | TT, L/C, Western Union, or another payment term. |
| After-sales Service | We will exchange goods and makeup compensation if they break up within the warranty. |
| Supply Ability | 200 Piece/Pieces per Week |
Kubota Model
| KX61 | U55-4A1 | U25 | KX161 |
| U45 | KX91 | U17 | KX121 |
| U35 | KX71 | U55-4GA1 | KX080 |
| U27 | KX41 | KX057 | KX033 |
| KX040 |
All the above Kubota models are for reference only. If you don’t have the model you need, you can contact us.
If you need a special size carrier roller, please contact us, we can customize the accessories according to your drawings. We can also customize according to the material, color, etc. customers need.
- The forged alloy steel design can effectively increase its service life.
- Wear resistance. corrosion resistance. high strength.
- First-rate material.
- The highest quality standardized production and quality inspection are implemented, and the product quality is highly reliable.
- Proficient in key links such as production, casting, forging, machining, etc.
- One-stop shopping, complete models, support OEM.
- Superior manufacturing processes produce all parts according to OEM standards
- Delivery Time: Within 4 weeks after payments (one week for products in stock)
- Package:1 poly bag/pcs ,1 inner box/pcs,6pcs or 12pcs/ctn.Neutral packaging carton and standard exported carton. Welcome your requirement for packaging cartons
- Shipping ways: By Air, Sea, and Express
- Port: Any port in china
- Transportation time: For express/ air, it takes about 5 days. For land/ sea, it takes about one month.
Related Products

Kubota Excavator Carrier Roller K121-2

Kubota Excavator Carrier Roller KX080

Kubota Excavator Carrier Roller U35

Kubota Excavator Carrier Roller U45-3




